Reconstruction works in a specific area of SΙΤΗΟΝΙΑ HOTEL – PORTO CARRAS RESORT to host a CASINO. MEP Engineering Design was carried out in parallel to the construction works and included the construction of new installations in an area of about 3,000 m2 and interventions in the existing installations of the hotel. During the construction, the designers carried out oversight tasks.